20 Years of VIVA Railings | 2005 – 2025 Learn More
20 Years of VIVA Railings | 2005 – 2025 Learn More
Our Free Standing Rails (FSR) and posts are both available in 1.5” diameter stainless steel in SS304 and SS316 alloys. FSR posts can be core mounted, top flange mounted, welded to steel or welded to concrete embed.
Prosper HS #3 features PC-22 Matte Black Powder Coated Posts
PROJECT TEAM
Pogue Construction is powered by the people. The employees attend the same churches, schools and medical centers and the community. They understand how important it is because they live and work right alongside their clients.
Huckabee, Inc. focuses on one thing: education. Huckabee believes the right environment will help bring about more confident students and have even teamed with Baylor University to study how learning environments impact the learning process.
ABOUT THE CAMPUS
Walnut Grove High School is the third school in the Prosper ISD District. This massive campus is over 600,000 sq ft. and houses a wide variety of CTE classrooms such as journalism, digital media, medical tech, and robotics.