The Railing Gap: Why Execution Matters More Than the Product
For a General Contractor, the railing package is often a late-stage hurdle. If the coordination isn’t perfect, it leads to damaged finishes, scheduling bottlenecks, and missed COOs.
At VIVA Railings, we don’t just manufacture systems; we manage the "Railing Gap." We’ve refined a workflow that prioritizes your schedule, eliminates field surprises, and ensures that by the time our team hits the site, the path to completion is already paved.
Here is what a smooth process looks like with VIVA.
1. Precision Engineering & Detailed Shop Drawings
A smooth install starts months before a truck arrives on-site. Our engineering team produces comprehensive submittal packages that do more than just show a design—they account for:
- Structural Integration: Precise attachment details for concrete, steel, or wood.
- Code Compliance: Automated checks for IBC/ADA height and loading requirements.
Conflict Detection: Identifying potential clashes with MEP or glazing early in the design phase.
2. Proactive Coordination Meetings
We don't wait for the RFI. VIVA’s project managers lean into the coordination phase.
- Pre-FAB Verification: We conduct site-specific measurements and laser scanning to ensure the shop drawings match the "as-built" reality.
Sequencing Alignment: We coordinate with your flooring and drywall subs to ensure our mounting brackets are installed at the optimal moment in your master schedule.
3. Logistical Mastery & Sequencing
We understand that job sites have limited laydown space. VIVA utilizes a Just-In-Time (JIT) delivery and sequencing model:
- Crated by Zone: Materials arrive organized by floor or wing, reducing search time and onsite handling.
Phased Delivery: We deliver only what can be installed in the immediate window to keep your paths of egress clear.
4. Field Support & Expert Installation
A railing system is only as good as its final connection. VIVA provides dedicated field support to ensure every post is plumb and every glass panel is aligned.
- Safety First: Our crews are fully trained in site-specific safety protocols.
- Punch-List Minimization: We perform our own internal quality audits during the install, so by the time you walk the site, the "to-do" list is already empty.
"VIVA’s ability to coordinate with other trades and their attention to the project schedule turned what is usually a headache into a highlight of our build." — Senior Project Manager, Tier 1 GC



